Personnel Plan

 

Global Solutions and Outreach Programs (GSOP)

 

 

     GSOP Personnel Plan is based on the GSOP Problem Diagrams and associated Solution Work Units. Personnel for each work unit is shown along with the team structure. Personnel hiring priorities are indicated as follows:

 

Priority 1: hire within 3 months.

Priority 2: hire within 6 months.

Priority 3: hire within 12 months for full-time + ½ part-time personnel. Hire remainder of part-time personnel as needed.

 

     To staff the GSOP at this rapid rate, Priority 1 hires will assist in selecting Priority 2 personnel. Likewise, Priority 2 full-time hires will assist to select the Priority 3 personnel.

 

     The three types of personnel positions are abbreviated as follows:

 

Problem Facilitators are designated “PF.” These are full-time personnel.

Full-time personnel are designated “FT.” These include the Problem Facilitators.

Part-time (4 hr./week) are designated “PT.”

 

     The numbers of full-time personnel that should be co-located are also indicated.

 

 

People’s Project 1

 

1. Organization Work Units – National

1 Team, 3 PF (Project 1 Core Team), 3 FT/0 PT (Co-locate 3 FT).

Total Personnel: 3 FT/0 PT (Co-locate 3 FT) Priority 1 3FT/0 PT, Priority 2: 0 FT/0 PT, Priority 3: 0 FT/ 0 PT.

 

2. Standardization Work Units – National & International

1 Team, 2 PF, 3 FT/10 PT (Co-locate 2 FT).

Total Personnel: 3 FT/ 10 PT (Co-locate 2 FT) Priority 1: 0 FT/1 PT, Priority 2: 1 FT/0 PT, Priority 3: 2 FT/ 9 PT.

 

3. Halt the net release of atmospheric CO2 by 2050, 2075 and 2100 Work Units – National

Based on 62 options under 6 categories.

a. 1 Overall Team, 3 PF, 3 FT/0 PT (Co-locate 3 FT).

Personnel: Priority 1: 1 FT/0 PT, Priority 2: 2 FT/0 PT, Priority 3: 0 FT/ 0 PT.

b. 3 Sub-teams for three largest categories, 2 PF over each of 3 sub-teams, = 6 FT/0 PT  (Co-locate 6 FT).

Personnel: Priority 1: 0 FT/0 PT, Priority 2: 1 FT/0 PT, Priority 3: 5 FT/ 0 PT.

 

c. 31 Sub-sub-teams for 62 options, 2/20 each sub-sub team = 62 FT/620 (Co-locate 0).

Personnel: Priority 1: 0 FT/5 PT, Priority 2: 0 FT/0 PT, Priority 3: 62 FT/ 615 PT.

Total personnel: 71 FT/620 PT (Co-locate 9 FT), Priority 1: 1 FT/5 PT, Priority 2: 3 FT/0 PT, Priority 3: 67 FT/ 615 PT.

 

4. Adapt to unavoidable climate change impacts by 2050, 2075 and 2100 Work Units. – National

Based on an assumed total of 15 options TBD.

a. 1 Overall Team, 3 PF, 3 FT/0 PT (Co-locate 3 FT).

Personnel: Priority 1: 1 FT/0 PT, Priority 2: 1 FT/0 PT, Priority 3: 1 FT/ 0 PT.

b. 8 Sub-sub-teams for 15 options, 2 FT/20PT each sub-sub team = 16 FT/160 PT (Co-Locate 2 FT).

Personnel: Priority 1: 0 FT/5 PT, Priority 2: 0 FT/0 PT, Priority 3: 16 FT/ 155 PT.

Total personnel: 19 FT/160 PT (Co-locate 5 FT) Priority 1: 1 FT/5 PT, Priority 2: 1 FT/0 PT, Priority 3: 17 FT/ 155 PT.

 

5. Integration & Reporting Work Units – National

1 Team, 2 PF, 10 FT/20 PT (Co-locate 10 FT).

Total personnel: 10 FT/ 20 PT (Co-locate 10 FT) Priority 1: 1 FT/0 PT, Priority 2: 1 FT/0 PT, Priority 3: 8 FT/20 PT.

 

6. Economics Work Units - National

1 Team, 2 PF, 5 FT/10 PT (Co-locate 5 FT).

Total personnel: 5 FT/ 10 PT (Co-locate 5 FT), Priority 1: 0 FT/1 PT, Priority 2: 2 FT/0 PT, Priority 3: 3 FT/ 9 PT.

 

7. Social/Political Work Units – National

1 Team, 2 PF, 5 FT/10 PT (Co-locate 5 FT).

Total personnel: 5 FT/ 10 PT (Co-locate 5 FT), Priority 1: 0 FT/1 PT, Priority 2: 2 FT/0 PT, Priority 3: 3 FT/ 9 PT.

 

8. International Outreach Work Units – International

1 Team, 2 PF, 10 FT/20 (Co-locate 10 FT).

Total personnel: 10 FT/ 20 PT (Co-locate 10 FT), Priority 1: 1 FT/0 PT, Priority 2: 1 FT/0 PT, Priority 3: 8 FT/ 20 PT.

 

9. Integration Work Units – Regional & Global

1 Team, 2 PF, 2 FT/10 PT (Co-locate 2 FT).

Total personnel: 2 FT/ 10 PT (Co-locate 2 FT) Priority 1: 0 FT/0 PT, Priority 2: 2 FT/0 PT, Priority 3: 0 FT/ 10 PT.

 

10. Economics Work Units – Regional & Global

1 Team, 2 PF, 2 FT/10 PT (Co-locate 2 FT).

Total personnel: 2 FT/ 10 PT (Co-locate 2 FT) Priority 1: 0 FT/0 PT, Priority 2: 2 FT/0 PT, Priority 3: 0 FT/ 10 PT.

 

11. Social/Political Work Units – Regional & Global

1 Team, 2 PF, 2 FT/10 PT (Co-locate 2 FT).

Total personnel: 2 FT/ 10 PT (Co-locate 2 FT) Priority 1: 0 FT/0 PT, Priority 2: 2 FT/0 PT, Priority 3: 0 FT/ 10 PT.

 

Total Project 1 personnel: 132 FT/880 PT.

Total Project 1 hiring priorities:  Priority 1 hires: 7 FT/13 PT, Priority 2 hires: 17 FT/ 0 PT, Priority 3 hires: 108 FT/867 PT.

Total Project 1 Co-locate: 55.

 

People’s Project 2

 

1. Organization Work Units – National & International

1 Team, 3 PF (Project 2 Core Team), 3 FT/0 PT (Co-locate 3).

Total personnel: 3 FT/0 PT (Co-locate 3 FT), Priority 1: 3 FT/0 PT, Priority 2: 0 FT/0 PT, Priority 3: 0 FT/ 0 PT.

 

2. Standardization Work Unit – International

Addressed through People’s Project 1.

 

3. Stabilize the Earth’s energy balance to halt global warming, adjust the Earth’s energy balance to return to prior conditions by 2050, 2075 and 2100 – International

Based on 43 options under 7 categories.

a. 1 Overall Team, 3 PF, 3 FT/0 PT (Co-locate 3).

Personnel: Priority 1: 1 FT/0 PT, Priority 2: 1 FT/0 PT, Priority 3: 1 FT/ 0 PT.

b. 2 Sub-teams for two largest categories, 2 PF over each of 2 sub-teams = 4 FT/0 PT (Co-locate 2).

Personnel: Priority 1: 0 FT/0 PT, Priority 2: 2 FT/0 PT, Priority 3: 2 FT/ 0 PT.

c. 22 Sub-sub-teams for 43 options, 2 FT/20 PT each sub-sub team = 44 FT/440 PT (Co-locate 0).

Personnel: Priority 1: 0 FT/5 PT, Priority 2: 0 FT/0 PT, Priority 3: 44 FT/ 435 PT.

Total personnel: 51 FT/440 PT (Co-locate 5), Priority 1: 1 FT/5 PT, Priority 2: 3 FT/0 PT, Priority 3: 47 FT/ 435 PT.

 

4. Address ocean acidification & other problems – International

Based on an assumed total of 15 options TBD.

a. 1 Overall Team, 3 PF overall, 3 FT/0 PT (Co-locate 3).

Personnel: Priority 1: 1 FT/0 PT, Priority 2: 1 FT/0 PT, Priority 3: 1 FT/ 0 PT.

b. 8 Sub-teams for 15 options, 2/20 each sub-sub team = 16/160 (C-locate 0).

Personnel: Priority 1: 0 FT/5 PT, Priority 2: 0 FT/0 PT, Priority 3: 16 FT/ 155 PT.

Total personnel: 19/160 (Co-locate 3) Priority 1: 1 FT/5 PT, Priority 2: 1 FT/0 PT, Priority 3: 17 FT/155 PT.

 

5. Integration & Reporting Work Units – International

1 Team, 2 PF, 2/10 (Co-locate 3).

Total personnel: 2/10 (Co-locate 3) Priority 1: 1 FT/0 PT, Priority 2: 1 FT/0 PT, Priority 3: 0 FT/10 PT.

 

6. Economics Work Units – Determined Nationally in People’s Project 1

7. Social/Political Work Units – Determined Nationally in People’s Project 1

 

Total personnel Project 2: 75/610.

Total Project 2 Priorities:  Priority 1 hires: 6 FT/ 10 PT, Priority 2 hires: 5 FT, 0 PT, Priority 3 hires: 64 FT/600 PT.

Total Project 2 Co-locate: 14.

 

 

People’s Project 3

 

1. Organization Work Units – National & International

1 Team, 3 PF (Project 3 Core Team), 3 FT/0 PT (Co-locate 3).

Total personnel: 3/0 (Co-locate 3) Priority 1: 3 FT/0 PT, Priority 2: 0 FT/0 PT, Priority 3: 0 FT/0 PT.

 

2. Standardization Work Unit – International

Addressed through People’s Project 1, 0/0.

 

3. Climate monitoring, models and future conditions – International

1 Team, 2 PF, 6 FT/20 PT (Co-locate 6).

Total personnel: 6/20 (Co-locate 6) Priority 1: 1 FT/5 PT, Priority 2: 1 FT/5 PT, Priority 3: 4 FT/10 PT.

 

4. Halt the net release of atmospheric CO2 - International

Based on a total of 11 options. 

a. 1 Overall Team, 2 PF, 2 FT/0 PT (Co-locate 2).

Personnel: Priority 1: 1 FT/0 PT, Priority 2: 1 FT/0 PT, Priority 3: 0 FT/ 0 PT.

b. 6 Sub-teams for 11 options, 2 FT/20 PT each sub-sub team = 12 FT/120 PT (Co-locate 0).

Personnel: Priority 1: 0 FT/5 PT, Priority 2: 2 FT/10 PT, Priority 3: 10 FT/ 105 PT.

Total personnel: 14 FT/120 P (Co-locate 2) Priority 1: 1 FT/5 PT, Priority 2: 3 FT/10 PT, Priority 3: 10 FT/105 PT.

 

5. Adapt to unavoidable climate change impacts - International

Based on an assumed total of 10 options TBD.

a. 1 Overall Team, 2 PF, 2 FT/0 PT (Co-locate 2).

Personnel: Priority 1: 0 FT/0 PT, Priority 2: 2 FT/0 PT, Priority 3: 0 FT/ 0 PT.

b. 5 Sub-teams for 10 options, 2/20 each sub-sub team = 10 FT/100 PT (Co-locate 0).

Personnel: Priority 1: 0 FT/0 PT, Priority 2: 2 FT/10 PT, Priority 3: 8 FT/ 90 PT.

Total personnel: 12 FT/100 PT (Co-locate 2) Priority 1: 0 FT/0 PT, Priority 2: 4 FT/10 PT, Priority 3: 8 FT/90 PT.

 

6. Stabilize and adjust the Earth’s energy balance to halt global warming and return to prior conditions - International

Based on a total of 12 options.

a. 1 Overall Team, 2 PF, 2 FT/0 PT (Co-locate 2).

Personnel: Priority 1: 0 FT/0 PT, Priority 2: 2 FT/0 PT, Priority 3: 0 FT/0 PT.

b. 6 Sub-teams for 12 options, 2/20 each sub-sub team = 12 FT/120 PT.

Personnel: Priority 1: 0 FT/0 PT, Priority 2: 2 FT/10 PT, Priority 3: 10 FT/110 PT.

Total personnel: 14 FT/120 PT (Co-locate 2) Priority 1: 0 FT/0 PT, Priority 2: 4 FT/10 PT, Priority 3: 10 FT/110 PT.

 

7. Address ocean acidification & other problems - International

Based on an assumed total of 10 options TBD.

a. 1 Overall Team, 2 PF, 2 FT/0 PT (Co-locate 2).

Personnel: Priority 1: 0 FT/0 PT, Priority 2: 2 FT/0 PT, Priority 3: 0 FT/ 0 PT.

b. 5 Sub-teams for 10 options, 2 FT/20 PT each sub-sub team = 10 FT/100 PT.

Personnel: Priority 1: 0 FT/0 PT, Priority 2: 2 FT/10 PT, Priority 3: 8 FT/90 PT.

Total personnel: 12 FT/100 PT (Co-locate 2) Priority 1: 0 FT/0 PT, Priority 2: 4 FT/10 PT, Priority 3: 8 FT/90 PT.

 

8. Integration & Reporting Work Units – International

1 Team, 2 PF, 2 FT/10 PT (Co-locate 2).

Total personnel: 2 FT/10 PT (Co-locate 2) Priority 1: 0 FT/0 PT, Priority 2: 1 FT/0 PT, Priority 3: 1 FT/10 PT.

 

9. Economics Work Units – Determined Nationally in People’s Project 1

 

10. Social/Political Work Units – Determined Nationally in People’s Project 1

 

Total personnel Project 3: 63 FT/470 PT.

Total Project 3 Priorities:  Priority 1 hires: 5 FT/ 10 PT, Priority 2 hires: 17 FT, 45 PT, Priority 3 hires: 41 FT/415 PT.

Total Project 3 Co-locate: 19.

 

 

Outreach Program

 

1. Organization Work Units – National

1 Team, 3 PF (Outreach Program Core Team), 10 FT/0 PT (Full-Time/Part Time) (Co-locate 10). Total Personnel: 10 FT/0 PT (Co-locate 10) Priority: 1: 10 FT/0 PT, Priority 2: 0 FT/0 PT, Priority 3: 0 FT/ 0 PT.

 

2. Integration & Reporting Work Units – National

Included in 1.

 

3. Outreach Work Units – State and Local

50 Teams, 2 PF per team and 20 part-time per team, 100/1,000.

Total Personnel: 100 FT/1,000 PT (Co-locate 0) Priority: 1: 2 FT/10 PT, Priority 2: 98 FT/0 PT, Priority 3: 0 FT/ 990 PT.

 

4. Integration Work Units – State and Local

Included in 3.

 

5. Social/Political Work Units – State and Local

Included in 3.

 

Total for Outreach Program: 110 FT/1,000 PT.

Total Outreach Program priorities: Priority 1 hires: 12 FT/10 PT, Priority 2 hires: 98 FT/0 PT,

Priority 3 hires: 0 FT/990 PT.

Total Outreach Program Co-locate 10.

 

 

Summary of GSOP Hiring Plans and Priorities:

 

Total People’s Project 1:  Priority 1 hires: 17 FT/13 PT, Priority 2 hires: 17 FT/ 0 PT, Priority 3 hires: 108 FT/867 PT, Project 1 total personnel: 132 FT/880 PT, Co-locate 55.

Total People’s Project 2:  Priority 1 hires: 6 FT/10 PT, Priority 2 hires: 5 FT, 0 PT, Priority 3 hires: 64 FT/600 PT, Project 2 total personnel: 75 FT/610 PT, Co-locate 14.

Total People’s Project 3:  Priority 1 hires: 5 FT/10 PT, Priority 2 hires: 17 FT/45 PT, Priority 3 hires: 41 FT/415 PT, Project 3 total personnel: 63 FT/470 PT, Co-locate 19.

 

Totals for GSP: Priority 1 hires: 18 FT/33 PT, Priority 2 hires: 39 FT/45 PT, Priority 3 hires: 213 FT/1,882 PT, GSP total personnel: 270 FT/1,960 PT, Co-locate 88.

 

Total Outreach: Priority 1 hires: 12 FT/10 PT, Priority 2 hires: 98 FT/0 PT, Priority 3 hires: 0 FT/990 PT, OP total personnel: 110 FT/1,000 PT, Co-locate 10.

 

Totals for GSOP: Priority 1 hires: 30 FT/43 PT, Priority 2 hires: 137 FT/45 PT, Priority 3 hires: 213 FT/2,872 PT, GSOP total personnel: 380 FT/2,960 PT, Co-locate 98.